Test whether the proposed system gives somebody authority to finish
A specification can describe every screen while leaving the decisive question unanswered: who is allowed to move the record to its next state? Ask these questions before approving a workflow whose value depends on a commercial or operational decision.
What evidence makes this action valid?
For a quotation, identify the applicable version and the material the reviewer needs. For an order change, identify whether work has already started and which existing commitment is affected. A button labelled “approve” should not hide a missing document or an unresolved commercial rule.
Ask what the system will show when that evidence is unavailable. Requiring staff to enter invented values to satisfy the screen would damage the record. A visible unresolved state with an owner can be more accurate and useful than forcing every item through a nominally complete path.
Which person can make the decision today?
Distinguish the account holder, task owner and authorised approver. A dealer contact may request a revision without being authorised to accept an order. An operator may prepare a document without being entitled to release it. The business defines these roles, and the system needs to express their actual relationship.
Now change the situation. The approver is absent, the contact leaves or the task moves to another team. Who can provide cover, and what happens to the history? A handoff should transfer pending responsibility without pretending that the new person made every earlier decision.
What if the latest information is not the applicable information?
A customer profile may contain a new address while an already released order must retain its agreed destination until reviewed. A product page may show a revised specification that does not apply retrospectively to an accepted offer. Ask which facts are snapshots of a decision and which are live reference data.
This distinction shapes integrations and reports. A system that always joins to the newest value can make old records look internally consistent while changing their meaning. The workflow-breakdown guide provides a concrete way to inspect that risk.
How will someone challenge a result?
An operator needs a route to say that a record is incorrect without deleting the evidence required to understand it. Decide how corrections, reversals and new requests are represented. The right approach depends on the task and any applicable requirements; it should be agreed with the responsible reviewers.
Ask what a customer sees during that review. A vague success message can imply that the requested change has already been applied. The wording should distinguish receipt, review and completion where those are separate events. Turkish and English reviewers should inspect the same stages.
What would stop the first release?
List the specific unresolved dependencies: account capability, source access, language approval, a commercial rule or professional advice. Give each an owner and a way to establish readiness. The purpose is to avoid discovering at the final review that the core action was never authorised or technically supported.
Use the answers to narrow a coherent phase. Project planning connects them to the delivery sequence, and contact provides a route to discuss the remaining uncertainty.